Holden Avenue - from John Young Parkway to Orange Blossom Trail New 4 Lane Roadway for Holden Avenue from John Young Parkway to Texas Avenue. Widening existing Holden Avenue from 2 to 4 lanes from Texas Avenue to Orange Blossom Trail
Includes sidewalks and bike lanes on both sides of the roadway throughout the project limits.
This roadway widening and new roadway will provide additional capacity and a new connection to John Young Parkway. Pedestrian safety will be improved with the addition of sidewalks.
Construction will begin in 2019.
Two retention pond sites are required for the project.
Highway Construction Division 4200 S. John Young Parkway Orlando FL 32802-1393 Phone: (407) 836-7998 Fax: (407) 836-7714