A water filled barrier wall can only be used on residential streets with a posted speed limit.
Use of water filled barrier wall on major roads with a posted speed shall be for short duration daylight hours only.
All barrier walls shall be installed per the current FDOT approved materials list guidelines.
A concrete barrier wall will be used on major roads with a posted speed, and installed per the current revision of FDOT indices 102-100, 102-110 & 102-120.
An approved Maintenance of Traffic (MOT) Plan shall be required any time work is being performed within the Orange County Right of Way regardless whether a permit is required or not. A MOT plan shall conform to the current FDOT Design Standards 600 series and The Manual on Uniform Traffic Control Devices (MUTCD). A copy of the MOT plan shall be kept on site at all times. The MOT plan is valid for the duration of the approved time period or completion of the project, whichever comes first. The contractor shall have the responsibility of the setup and removal of all MOT devices when required.
The approval of an MOT plan requires a minimum of five working days from the time of receipt of all required plans and follows the process stated below. Additional time may be required for more complex plans or plans requiring additional coordination.
MOT Permit Cost is $128.00.
Links:
Downloads:
Orange County Public Works Traffic Engineering Division 4200 South John Young Parkway Orlando, FL. 32839 Email: TEPermits@ocfl.net Josh Gonzalez Phone: (407) 836-8025 Mayda Leon Phone: (407) 836-7890