Skip to main content
     Search our site Browse Services

All American & Kennedy Boulevard

Project Construction

All American & Kennedy Boulevard

Project Construction

Project Limits

The All-American Boulevard project limits range from the intersection of Edgewater Drive and Clarcona-Ocoee Road to approximately 500 feet west of the intersection of Forest City Road (SR 434) and Kennedy Boulevard. Kennedy Boulevard, from All American Boulevard to Wymore Road

The project includes major roadway improvements at All American Boulevard, Kennedy Boulevard West, and the Forest City Road/Kennedy Boulevard intersection to improve traffic flow, safety, drainage, and infrastructure.

  • All American Boulevard: Construction of a new four-lane divided roadway and improvements to existing roadways, including sidewalks, driveways, medians, railroad crossing upgrades, stormwater drainage systems, re-tention ponds, a new box culvert, landscaping, and water main relocations.
  • Kennedy Boulevard West: Widening and reconstruction of approximately one mile of roadway from two lanes to a four-lane divided roadway with raised medians. Improvements include new pavement, sidewalks, driveways, drainage facilities, stormwater treatment ponds, barrier walls, signage, pavement markings, landscaping, and significant utility relocations.
  • Forest City Road/Kennedy Boulevard Intersection: Upgrades to the intersection, including new traffic signal mast arms, roadway widening, milling and resurfacing, sidewalks, ADA-compliant curb ramps, traffic separators, and drainage improvements connected to the existing FDOT drainage system.

Public Involvement

Continue to monitor this site for upcoming public meetings/Newsletter.

Contact Us

Orange County Public Works Department
– Highway Construction Division

Angela Hargis, Sr Engineering Inspector
407-836-7995
Angela.Hargis@ocfl.net

Fernando Velasquez, Chief Engineering Inspector
407-836-7713
Fernado.Velasquez@ocfl.net