Clarcona-Ocoee Road

Solution for increasing traffic from existing and expected development.

Preferred?

By popular demand – this was the preferred alignment.

  • The preferred alignment begins at Ocoee-Apopka Road, north of the existing West Road intersection.
  • Runs east along the north side of existing West Road to the proposed interchange with the Western Beltway.
  • From the Western Beltway interchange, the alignment swings to the south and intersects with the existing Clarcona-Ocoee Road alignment near Carpet Street.
  • The alignment continues along the existing alignment through Adair Street where it curves to the north and follows the existing Clarcona-Ocoee Road alignment from Ingram Road to Hiawassee Road.

The Decision

Based on:

  • Public input received at the Neighborhood Meetings.
  • Public Workshops Engineering, environmental and social evaluations.
  • Following Local Planning Agency approval, the final roadway improvement alternative was recommended to the Board of County Commissioners (BCC) at a BCC Public Hearing.


Contact Us

Orange County Engineering
4200 S. John Young Pkwy.
Orlando, FL. 32839

Phone: (407) 836-7908
Fax: (407) 836-8024